Case Studies Groundwater Remediation

The Problem

  • Contaminated perched groundwater was providing hindrance to site remediation and development works.
  • Large flow rates were required to effectively de-water excavations.
  • Mixed contamination typical of coal gas works were present including cyanide, heavy metals, phytotoxic metals, BTEX compounds and PAH's.
  • The development programme was in doubt.

The Solution

  • Contaminated groundwater pumped to 2 no 15,000 litre settlement tanks.
  • Water passed through an automated several stage treatment system, including an oil water separator, sand and carbon filters.
  • Treated water discharged to sewer under discharge consent.
  • Initial discharge rates of 100 m3 per 24 hours, were increased to 500 m3 per 24 hours once effective treatment was demonstrated.
  • The system ran 24 hours per day, 7 days per week for a period of 9 months.
  • Alpha personnel managed all aspects of design, installation, day to day running, analysis and negotiations with local agencies.

The Benefits

  • All limits set by the Water Company under the discharge consent were met.
  • Daily records of discharged volumes submitted to the client
  • Development works continued according to the initial programme set.
  • Contractor no longer needed to worry about groundwater.
© 2007 ATG Services. All rights reserved. Home | Company | Services | Technology | Case Studies | Contacts Us